Watch the Align Builders' video on Linked In.
Our team at Shiley Eye has been working tirelessly to keep this ambitious project moving forward on schedule. Just a few weeks ago the final elevator shaft lift was completed to top off the new elevator structure. Also, Clinical spaces are transforming with gypsum board, resembling real rooms more each day. Great work team, it has been so inspiring to see the progress being made at Shiley.
Stay tuned for more updates on this exciting project!
The information contained in this online site is intended to provide accurate and helpful health information for the general public. It is made available with the understanding that the author and publisher are not engaged in rendering medical, health, psychological, or any other kind of personal professional services on this site. The information should not be considered complete and does not cover all diseases, ailments, physical conditions or their treatment. It should not be used in place of a call or visit to a medical, health or other competent professional, who should be consulted before adopting any of the suggestions in this site or drawing inferences from it.
The information about drugs contained on this site is general in nature. It does not cover all possible uses, actions, precautions, side effects, or interactions of the medicines mentioned, nor is the information intended as medical advice for individual problems or for making an evaluation as to the risks and benefits of taking a particular drug.
The operator(s) of this site, and the publisher, specifically disclaim all responsibility for any liability, loss or risk, personal or otherwise, which is incurred as a consequence, directly or indirectly, of the use and application of any of the material on this site.
Click Here To Accept